Bulk TV Units for Developers: Coordinating Finish, Size and Delivery by Building Phase

Large residential schemes rarely complete all at once, so media furniture should not arrive all at once either. This guide explains how to split a bulk TV unit order into phases that follow your construction handovers.

Buying bulk TV units for developers is not only a question of quantity. On a multi-block or multi-phase scheme, the real challenge is making sure each batch arrives when the apartments are ready to receive it, and that the finish and size match the batches before and after it. A phased order, planned around your handover dates, is usually the most practical answer.

This guide looks at how to divide a large apartment media furniture order into phases, what to fix in the specification from day one, and how to keep production, shipping and site access in step. We build custom media furniture to project drawings in our own factory in Istanbul, so the points below come from the manufacturing and export side of the process.

Why phased delivery suits developer projects

Apartments are handed over block by block, floor by floor or stage by stage. Delivering every TV unit in a single shipment sounds efficient, but it often creates problems that cost more than the freight saving.

  • Storage risk: wood-based furniture stored for months on site can be damaged by humidity, dust, trades working nearby or theft.
  • Cash flow: paying for and receiving the whole order before the first block is complete ties up capital early.
  • Design changes: if later phases change layout or screen size, units already made may no longer fit.
  • Site congestion: a full order of bulky cartons can block corridors and lifts that other trades need.

Phasing does add some coordination work, but it keeps furniture close to the installation date and leaves room to adjust later batches.

Start with a unit schedule, not a quantity

Before asking for a quotation, build a schedule that lists every apartment type and the media furniture each one needs. This is the document that makes phasing possible.

What the schedule should contain

  • Apartment or room type codes and the number of each type in every phase
  • Wall width and available depth where the unit will sit
  • Screen size the unit must accommodate, with a note on wall-mounted or stand-mounted fitting
  • Wall type (concrete, drywall or brick) if the unit or panel is fixed to the wall
  • Finish code for each unit type
  • Target handover date for each block or floor

With this, a manufacturer can group identical units into production runs and quote a realistic price for the whole programme and for each phase.

Keeping size consistent across phases

A common developer mistake is to specify dimensions loosely in phase one and tighten them later, when the walls are actually built. By then the first batch is already made. A better approach is to confirm the dimensions on the as-built wall or on a finished sample apartment before bulk production starts.

Where the structure varies from block to block, consider a small set of standard sizes rather than one size for everything. For example, two or three widths can cover most layouts, and they remain easy to repeat in later phases. Fewer variants also keep production simpler and make reorders easier to match.

Allow for tolerance on site

Walls are rarely perfectly straight or square. Ask for technical drawings that show the nominal sizes and the tolerances, and leave a small gap or scribe detail where the unit meets the wall or ceiling. This helps the same unit fit across blocks built by different crews.

Controlling finish across batches

Finish consistency is the main visual risk in a phased order. If phase one is delivered this year and phase three next year, a slightly different wood tone or sheen will be noticeable when owners compare apartments or when the lobby and units sit in view of each other.

  • Approve a physical sample: have the finish signed off in writing, with the sample kept by both sides as a reference.
  • Name the finish precisely: use an exact code, such as a laminate decor reference or a RAL number, rather than only a colour name like walnut or grey.
  • Buy materials together where possible: boards, veneers and laminates can vary between production lots, so reserving material for later phases at the start reduces the difference.
  • Check natural materials carefully: real wood veneer varies by nature, so agree how much variation is acceptable.

If you want to explore how factories keep colours aligned over time, you can read more on reorders and batch matching in related guides on this site.

Building the delivery plan around handovers

The delivery plan should work backwards from the date each block must be ready for installation. Production time, packing, transport and customs clearance all sit between your drawing approval and that date, and the length of each depends on the project.

Factors that shape the schedule

  • Size and complexity of each phase
  • Material availability and finish type
  • Approval speed for samples and drawings
  • Shipping route, port handling and destination customs process
  • Site readiness: floors finished, painting complete, lifts available

We do not quote fixed timings without the project details, because they depend on these factors. What we can do is agree a schedule with you in which each phase has its own production slot and shipping date linked to your construction programme.

Packing and shipping by phase

Each phase should be packed and labelled so that it can be found and installed without opening everything. Label cartons by block, floor and apartment type, and include a packing list that matches your unit schedule. This saves hours on site and prevents the wrong finish reaching the wrong apartment.

For international orders, discuss the shipping terms early. EXW, FOB, CIF and DAP divide cost and responsibility differently, and the right choice often depends on whether you have your own freight forwarder or want the supplier to manage delivery to site. Where phases are small, consider whether a full container is needed each time or whether consolidating with other furniture makes sense.

Installation and site access

Plan how units will physically reach each apartment. Check lift capacity, corridor width and staircase turns against the largest packed piece. Assembly instructions or installation drawings help contractors, particularly if different teams handle different phases.

We can support on-site installation depending on the project and location, so confirm this at quotation stage rather than assuming it.

Phased payment and order terms

Payment schedules for developer orders are usually tied to production and shipping milestones. A common structure is a deposit on order confirmation and further payments linked to each phase, but the exact terms are agreed per project. Make sure the order confirmation states quantities, finishes and delivery windows for every phase, as well as what happens if a handover date moves.

Practical checklist before you place the order

  1. Prepare a unit schedule by apartment type and phase.
  2. Confirm wall dimensions on a built apartment or approved drawing.
  3. Approve a sample unit and finish in writing.
  4. Reserve materials for later phases if the programme is long.
  5. Agree production slots and shipping terms for each phase.
  6. Define labelling, packing and delivery sequence.
  7. Check site access, storage and installation resources.
  8. Set a process for design changes between phases.

Next step

If you are planning a residential scheme and need bulk TV units for developers, send us your unit schedule, drawings and handover programme. We will review the project and come back with a phased proposal covering finishes, sizes, packing and shipping options for your destination.

Sıkça Sorulan Sorular

Can a bulk TV unit order be delivered in several phases?

Yes. Many developer orders are split into phases that follow block or floor handovers. Each phase gets its own production slot, packing list and shipping date, which keeps furniture close to installation and reduces storage risk on site.

How do you keep finishes consistent between phases?

Approve a physical sample in writing, specify an exact finish code, and reserve materials for later phases where possible. Natural veneers vary, so agree an acceptable range at the start and keep a reference sample on both sides.

Do I need a sample apartment before ordering in bulk?

It is strongly recommended. A sample unit installed in a finished apartment confirms dimensions, finish and fixing details before mass production starts, when changes are still inexpensive.

Can phases change size or design after the first delivery?

Often yes, as long as the later phases have not entered production. Agree a change process in the order terms, since new sizes may affect price and lead time.

Do you ship worldwide for developer projects?

We produce custom and bulk furniture in Istanbul and export to many regions. Shipping terms such as FOB, CIF or DAP and the route depend on your destination, so share your project location when you request a quotation.

Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.

Related products

All Console Table Models

Get a quote for Console Table Models

Share dimensions and quantities; we will prepare a quote for your project.