Consoles and Dressers

Console Table FAQs for Overseas Buyers: Samples, Drawings, Payment and Delivery Questions

First-time international buyers tend to ask the same practical questions about console orders: what to send, how samples work, how payment is staged and how goods reach site. This guide answers them in the order they usually come up.

Most console table buyer questions from overseas clients are not about wood or style. They are about process: what you need to send, how a sample works, when you pay, how the pieces travel and who is responsible at each step. This guide answers those questions for hotel owners, designers and contractors ordering made-to-order pieces from a factory abroad. We produce to project drawings in Istanbul and supply projects worldwide, so the answers below reflect how an export order normally runs.

Before You Contact a Factory: What to Prepare

You do not need a finished technical package to start a conversation. A clear brief is enough to receive a first response, and the more detail you add, the more accurate that response will be.

The minimum useful brief

  • Quantity: total pieces and how many of each size or variant.
  • Dimensions: length, depth and height in millimetres, with inches in brackets if your team works in imperial.
  • Reference: a drawing, sketch, photo or mood board showing the intended look.
  • Finish direction: a wood tone, RAL colour or physical sample if you have one.
  • Destination: country and city or port, plus the target installation date.

Drawings versus photos

Drawings in PDF or CAD form let a manufacturer quote precisely. A photo or sketch is still workable, but the factory will treat the first price as an estimate and prepare shop drawings for your approval before production. Treat that approval step as the point where the design becomes fixed.

Samples: What to Expect

Samples reduce risk on custom pieces, and most overseas buyers want one before releasing a full order. The practical questions are what the sample represents, how long it takes and who covers the cost.

What a sample should show

A useful sample confirms the proportions, the finish and colour, the joinery and the hardware. Where a project uses several finishes, a separate finish panel can be quicker than building a full piece for every option. Ask the factory to state clearly what is included so you can compare it with the production specification.

Sample cost and timing

Sample cost depends on the complexity of the piece, the materials and whether special tooling or a custom finish is needed. Timing depends on the factory schedule and on how quickly you approve the drawings. We do not quote fixed figures in general terms because they vary by design; send the brief and we will confirm both for your piece. Many factories credit or adjust the sample cost against a confirmed order, but this is a commercial term to agree in writing.

Why production pieces can differ slightly from the sample

Natural timber and veneer vary in grain and tone from board to board. Agree an acceptable range in advance, ideally by approving a sample plus a reference panel for finish, so the delivered batch is judged against something documented rather than memory.

Drawings and Approvals

For custom work, the approval of shop drawings is the control point of the whole order. After you confirm the brief, the factory prepares drawings showing elevations, sections and key joinery details.

  1. Check overall dimensions against the actual space, including skirting boards, sockets and door swings.
  2. Confirm material, thickness of the top and edge profile.
  3. Verify the fixing method if the piece is wall-mounted or must be anchored.
  4. Confirm finish code, gloss level and any logo or engraving details.
  5. Sign off the drawing and keep a dated copy.

Changes after this stage can affect price and lead time, so it is worth involving the designer, operator and contractor before you approve.

Payment: How Orders Are Usually Structured

Payment terms vary by supplier and by project, so treat what follows as a typical pattern rather than a fixed rule. Custom furniture is usually paid in stages linked to milestones instead of in one transfer.

  • Deposit: paid on order confirmation to reserve production capacity and purchase materials.
  • Production milestone: sometimes requested when materials are in and production is under way.
  • Balance: usually due before shipment or against shipping documents, depending on what you agree.

Ask the factory to put the milestones, currency and bank details in the written quotation or contract. If you are comparing quotes, check that each one states the same Incoterm, because a price that excludes freight is not comparable with one that includes delivery.

Delivery Questions: From Factory Gate to Site

Delivery questions are where first-time overseas buyers feel least certain. The answers depend on the destination, the volume and the terms you choose.

Which shipping terms are common?

TermWhat it generally means for you
EXWYou collect from the factory and arrange all transport and export formalities.
FOBThe seller delivers goods onto the vessel at the named port; you handle the main freight.
CIFThe seller arranges freight and insurance to the destination port; import clearance is yours.
DAPThe seller delivers to the named place, ready for unloading; import duties and clearance are yours.

Choose the term that matches your own logistics capability. If you have a freight forwarder, FOB or EXW may be simpler; if you want one party to coordinate to site, DAP is often more convenient. Confirm the exact obligations in the contract.

How are the pieces protected in transit?

Wooden surfaces, legs and any stone or glass tops need separate protection: corner guards, wrapping, foam and sturdy cartons or crates. Ask the factory to describe the packing method and to send photos before shipment so you can check condition and quantities against the packing list.

How long will delivery take?

Total time is the sum of sample approval, production, packing, transit and customs clearance. Production time depends on quantity, finish complexity and the current factory schedule, and transit depends on the route and mode of transport. We prefer to give a project-specific schedule instead of a general promise, so share your destination and opening date early.

Who handles customs and duties?

Under most terms, import duties, taxes and local clearance sit with the buyer or their agent. The factory supplies the commercial invoice, packing list and other documents your broker requires. Check early whether your country asks for additional paperwork such as certificates of origin.

On Arrival: Checking and Installing

Plan the receiving process before the container lands. Count packages against the packing list, inspect for visible damage and photograph any issue before unpacking further. Report problems promptly and in writing so they can be assessed against the agreed specification.

If you need installation, clarify whether it is part of the scope or handled by your fit-out contractor. For wall-mounted or anchored pieces, share the wall type so the correct fixings are supplied.

Common Misunderstandings to Avoid

  • Assuming a photo equals a specification: a picture does not define thickness, joinery or finish.
  • Comparing quotes with different terms: check Incoterm, packing and sample treatment first.
  • Skipping sample approval to save time: a correction after production costs more than the sample would have.
  • Leaving delivery planning to the end: lift access, storage and site readiness affect when pieces can be accepted.

Next Step

If you are planning an order, send us your drawings, sketch or reference photo with quantities and destination. We will review the brief and reply with questions, suggested specifications, sample options and shipping choices for your project.

Sıkça Sorulan Sorular

Can I order console tables from overseas without a technical drawing?

Yes. A sketch, reference photo or mood board with target dimensions and quantity is enough to start. The factory will prepare shop drawings for your approval before production. Treat any early price as an estimate until those drawings are signed off.

Do I have to pay for a sample?

Usually a sample involves a cost because it is a custom piece built to your specification. The amount depends on design complexity, materials and finish. Whether it is credited against a confirmed order is a commercial term, so agree it in writing.

How is payment normally arranged for an export order?

A common pattern is a deposit on order confirmation and the balance before shipment or against shipping documents. Some projects add a production milestone. The exact split, currency and method should be stated in the quotation or contract.

Which Incoterm should I choose for console tables?

It depends on how much logistics you want to manage. FOB or EXW suits buyers with their own forwarder, while DAP suits those who want delivery coordinated to a named place. Always compare quotes using the same term.

How are wooden console tables protected during shipping?

Pieces are typically wrapped, fitted with corner protection and packed in cartons or crates, with stone or glass tops packed separately. Ask for packing photos before dispatch so you can check them against the packing list on arrival.

Can you deliver to any country?

We supply projects worldwide, but routes, transit time and import requirements differ by destination. Share your delivery location and target date and we will outline realistic shipping options and the documents your customs broker will need.

Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.

Related products

All Console Table Models

Get a quote for Console Table Models

Share dimensions and quantities; we will prepare a quote for your project.