Console Table Payment and Production Milestones: A Typical 30-60-90 Day Schedule
A practical guide to linking payment events with production stages on a mid-size console table order. Use it as a planning model, then adjust it to your own project.
A clear console table production schedule gives both sides the same picture: what happens, when it happens and which payment is linked to it. For a mid-size hotel order, a 30-60-90 day structure is a useful planning model. It is not a fixed promise, because real timing depends on quantity, materials, finishes and how quickly approvals are given.
This guide maps each payment event to a production stage so you can build a furniture order timeline that protects your cash flow and your opening date. We work with buyers worldwide, so the model below is written to suit international orders made to project drawings.
Why link payments to production stages?
Custom furniture is made specifically for your project, so the factory commits to timber, veneers, hardware and labour as soon as an order is released. Payments tied to visible milestones are fair to both parties. You pay as the work progresses, and the factory can secure materials and capacity without carrying all the risk.
Milestone payments also create natural checkpoints. Each one is a moment to review drawings, samples or photos before the next stage begins.
What we mean by a mid-size order
For this article, a mid-size order is a batch of console tables for one hotel or a small group of properties, often in a few sizes or finishes. It is large enough to need planned production slots, but small enough that one factory can run it as a single batch or in two deliveries.
Very small runs and very large chain programmes follow different logic. A large programme may be split into several batches, each with its own schedule.
The 30-60-90 day model at a glance
| Phase | Indicative window | Production stage | Typical payment event |
|---|---|---|---|
| 1 | Days 0-30 | Drawing approval, sample or mock-up, material purchase | Deposit |
| 2 | Days 30-60 | Machining, assembly, sanding, first finishing | Progress payment (if agreed) |
| 3 | Days 60-90 | Final finish, inspection, packing, loading | Balance before shipment |
Treat these windows as a framework. Some projects need longer in phase 1 because of sample revisions, and others move faster when drawings are complete on day one.
Phase 1: Days 0-30, approvals and the deposit
The schedule starts when you confirm the order and pay the deposit. Before that, the quotation, drawings and specification should already be agreed, so that the deposit releases a clear scope rather than an open discussion.
What happens in this phase
- Shop drawings: dimensions, joinery details, leg and top construction, and fixing points are confirmed in writing.
- Finish sample: a colour and sheen sample is prepared and approved under your lighting conditions.
- Pre-production sample: for custom designs, a first piece or prototype may be made to check proportions and quality.
- Material purchase: timber, veneer, stone or glass tops, hardware and packing materials are ordered.
How the deposit fits
The deposit covers material purchase and reserves the production slot. The percentage is agreed per project and often reflects how much custom material, such as stone tops or special veneers, has to be bought up front. Ask for the deposit terms in the quotation so there are no surprises.
Remember that the production clock only runs properly once approvals are complete. Late sample feedback is the most common reason a schedule slips in this phase.
Phase 2: Days 30-60, core production and progress payment
With drawings and samples approved, the factory moves into machining and assembly. Timber is cut and shaped, panels are built, legs and frames are joined, and tops are prepared. Pieces then go through sanding and the first finishing steps.
Checkpoints worth requesting
- Progress photos of assembled but unfinished pieces, which show joinery quality before it is covered by lacquer or oil.
- Confirmation that the approved sample is being used as the reference for every piece.
- A short report on any material substitutions or delays, raised early rather than at the end.
Progress payment
Many mid-size orders use a three-step structure: deposit, progress payment and balance. The progress payment is linked to a verifiable event, such as completion of assembly, and is supported by photos. Some buyers prefer a two-step structure with only a deposit and a balance, which is also common. Either is workable if it is stated clearly in the order confirmation.
Phase 3: Days 60-90, finishing, inspection and balance
The final phase covers finishing, curing, quality checks and packing. Finish consistency across the whole batch matters most here, so pieces are checked against the approved sample under suitable light.
Before you release the balance
- Review final photos or a video inspection of the full batch, including labels and packing.
- Check dimensions on a sample of pieces against the drawing tolerances.
- Confirm packing method, carton or crate marking and the shipping terms, such as EXW, FOB, CIF or DAP.
The balance is normally due before the goods leave the factory or before the shipping documents are released. This keeps the process simple for international orders and avoids pieces waiting in storage.
Where shipping fits in
Transit time is separate from the production schedule and depends on destination, route and shipping method. A buyer in a nearby market and one on another continent will see very different delivery windows even with identical production timing. Always add transit, customs clearance and site delivery on top of the 90 days when you plan your opening date.
If the hotel needs furniture to arrive floor by floor, agree the delivery sequence early. Splitting a batch into two shipments can change both the payment schedule and the freight cost.
What can move the schedule
- Approval speed: every day spent waiting for a sample decision is a day added to the timeline.
- Material choice: stone tops, special veneers or imported hardware can have longer sourcing times than standard timber.
- Design changes: changes after the deposit may alter cost and delivery, so they are best made during the sample stage.
- Factory capacity: seasonal peaks before hotel openings can affect available production slots, so reserve early.
- Payment timing: a delayed deposit or progress payment delays the stage it is meant to release.
Practical tips for a smooth schedule
- Agree the payment structure in writing before the order is confirmed.
- Define each milestone by an observable event, not just a date.
- Keep one approved sample as the single reference for the whole batch.
- Ask for photo updates at each stage and respond to them promptly.
- Link your construction programme to the planned shipping date, with some buffer.
Conclusion
A 30-60-90 day model is a helpful starting point for planning a console table production schedule and its payments. The exact windows and percentages should be set per project, based on quantity, materials, finishes and your delivery requirements.
If you are planning a console table order, send us your drawings or a brief with quantities and finish preferences. We will review them and suggest a production schedule and payment structure that fits your project.
Sıkça Sorulan Sorular
How are payments usually structured for custom console table orders?
Many orders use a deposit to start material purchase, an optional progress payment after assembly, and a balance before shipment. The exact split depends on the project, the materials involved and what is agreed in the quotation or order confirmation.
Is 90 days a realistic production time for a mid-size console table order?
It is a useful planning model, but not a fixed figure. Actual timing depends on quantity, materials, finishes, sample approvals and factory capacity. Complete drawings and quick approvals usually make a schedule shorter and more predictable.
When does the production clock start?
Generally it starts once the order is confirmed, the deposit is received and drawings and finish samples are approved. Waiting for approvals or changing the design after the deposit can move the delivery date.
Should I pay the balance before or after shipping?
For international orders, the balance is commonly settled before the goods leave the factory or before shipping documents are released. Check final photos or a video inspection first, and confirm the arrangement in writing when you place the order.
Can I split a console table order into two deliveries?
Often yes. Staged deliveries can suit hotels that open floor by floor. Splitting a batch may change freight cost and the payment schedule, so discuss it before the order is confirmed so both sides plan for it.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.