How Long Does It Take to Make Custom TV Units and Vitrines? A Production Timeline

Custom TV unit production time depends on stages such as drawing approval, sampling, manufacturing, finishing and shipping. This guide breaks down each stage and shows how small and bulk orders differ.

Custom TV unit production time is rarely a single number. It is the sum of several stages, from drawing approval to export packing, and each stage behaves differently for a small run than for a bulk order. Vitrines add a few extra steps, mainly glass, lighting and locks. Below we break the process into stages and give typical ranges in weeks, so you can plan your own schedule realistically.

The ranges in this guide are planning indications, not fixed promises. Your actual timeline depends on the design, materials, quantity and the speed of your approvals, and we confirm it in writing once we have reviewed your drawings.

The short answer: what drives the total time

For most made to order furniture timeline questions, four factors decide the outcome:

  • Quantity: a handful of pieces and several hundred pieces need very different production planning.
  • Complexity: slatted fronts, curved parts, mirrors, backlighting and mixed materials add steps.
  • Material availability: standard boards are usually quick to source; special veneers, imported glass or particular fittings can take longer.
  • Approval speed: waiting for comments on drawings or samples is the most common cause of delay, and it sits on the buyer's side of the schedule as often as on the factory's.

Stage 1: Briefing, drawings and quotation

Everything starts with your brief: dimensions, screen sizes, quantities, finishes and photos or sketches. If you already have technical drawings, this stage is short. If you only have reference photos, our team prepares shop drawings first, which takes longer.

  • Complete drawings: usually a matter of days for a quotation.
  • Reference photos only: allow additional time for drawing preparation and a few revision rounds.

Sending dimensions, quantities and photos together in the first message is the simplest way to shorten this stage.

Stage 2: Drawing approval and finish selection

Before cutting begins, you confirm the shop drawings, cut-outs, hardware and finishes. For TV units this includes cable routing, ventilation openings and wall fixing details. For vitrines it includes glass type, shelf spacing, lighting and lock choice.

This stage is often quicker or slower than planned because it depends on how many people must sign off. A designer, an owner and a procurement manager may each have comments. Collecting them into one consolidated reply saves a surprising amount of time.

Stage 3: Sampling or mock-up

For a single custom piece, the first unit may effectively be the sample. For larger orders, a sample TV unit or vitrine lets you check proportions, colour, hardware feel and glass quality before production starts.

  • Sample production: commonly one to a few weeks, depending on finish and complexity.
  • Transit and review: if you receive the physical sample, add courier time and your own review period. Photos and video calls can shorten this considerably.

Skipping the sample on a bulk order may save weeks at the start, but it raises the risk of corrections after production, which cost far more time than the sample would have.

Stage 4: Material procurement

Boards, veneers, laminates, edging, hardware, glass and LED components must be on hand before the main run. Standard items are often held in stock or available quickly. Special colours, particular veneer sheets, tempered or laminated glass cut to size, and specific lock systems may need ordering.

For bulk orders, material quantities are larger, so procurement should be planned alongside sample approval rather than after it. This is one of the easiest places to gain time.

Stage 5: Cutting, edging and machining

Panels are cut to size, edged, drilled and machined according to the approved drawings. This is the stage where a factory's machinery and shift planning matter most. A small order passes through quickly, while a large order is scheduled in batches.

Consistency is the focus here: identical cut-outs and hinge drilling across all pieces make assembly and installation smoother later.

Stage 6: Finishing

Finishing is frequently the longest single production step, because paint, lacquer and veneer finishes need drying and curing time between coats. Compare the typical effects:

Finish typeEffect on schedule
Melamine or laminateShortest; finish is part of the board
Wood veneer with lacquerMedium; pressing, sanding and several coats
Painted or high-gloss lacquerLongest; multiple coats, curing and polishing

Colour matching to a sample or RAL reference may require test panels, which should be approved before the main batch is sprayed.

Stage 7: Assembly, glass and fitting

TV units are assembled with their hardware, drawers and back panels. Vitrines receive glass, shelves, lighting, drivers and locks. LED wiring and glass fitting are careful tasks, and testing each lit vitrine adds a little time but prevents problems on site.

Where pieces ship flat-packed, this stage is simpler, though a trial assembly of a sample set is still worthwhile.

Stage 8: Quality control and packing

Each piece is inspected for dimensions, finish, hardware function and glass condition. Export packing then protects corners, glass and finished surfaces, usually with cartons, foam or board protection and strapped pallets or crates. Glass vitrines need more protective packing than TV units, and this takes extra hours per piece in a bulk order.

Stage 9: Shipping and delivery

Transit time depends on the destination, the shipping mode and the Incoterm you choose. Under EXW or FOB, your forwarder or shipping line controls much of the schedule after the goods leave our factory. Under CIF or DAP, we coordinate more of the journey, but port procedures and customs clearance still vary by country.

For TV cabinet delivery weeks, always ask for the shipping estimate separately from the production estimate, so you can see which part of the schedule each of us controls.

Small order versus bulk order: a comparison

StageSmall order (few pieces)Bulk order (many pieces)
Drawings and approvalShort if drawings are readyLonger; more stakeholders and details
SampleOften the first piece itselfRecommended, adds one to a few weeks
MaterialsQuick if standardNeeds early ordering
ProductionDays to a couple of weeksSeveral weeks, in batches
PackingFastLonger; pallet and container planning
ShippingOften shared or part-loadFull container planning

As a rough planning view, a small run can move from approved drawings to ready-for-dispatch in a matter of weeks, while a large programme needs a longer window with sampling and batch production. We give a specific schedule only after reviewing the actual specification.

Where vitrines take longer than TV units

  • Glass cutting, tempering and delivery to the factory.
  • Lighting components and driver testing.
  • Lock systems, especially master-key arrangements across many cabinets.
  • Mirrors, brass details or backlit panels.
  • More careful packing and, sometimes, a separate crate for glass.

How to shorten your timeline without cutting quality

  1. Send complete drawings, quantities and finish references in your first enquiry.
  2. Approve samples through photos and video calls when possible.
  3. Choose standard board colours and hardware where design allows.
  4. Confirm finish and RAL references before production, not during it.
  5. Decide your Incoterm and delivery address early so packing and booking can be prepared.
  6. Group TV units and vitrines in one order and one container where it makes sense.

Common causes of delay

  • Late or repeated design changes after drawings are approved.
  • Unclear cut-out dimensions for screens or equipment.
  • Finish colour disagreements found only after spraying.
  • Payment or documentation steps that are not prepared in advance.
  • Port, customs or seasonal shipping congestion on the destination side.

Next step

If you are planning a custom TV unit or vitrine order, send us your drawings, quantities and target delivery date. We will review them and reply with a stage-by-stage schedule and shipping options for your destination.

Sıkça Sorulan Sorular

How long does custom TV unit production take?

It depends on quantity, finish and approvals. A small run can often be produced in a few weeks after drawings are approved, while bulk orders need longer for sampling, materials and batch production. We confirm a project-specific schedule after reviewing your drawings.

Why do vitrines take longer than TV units?

Vitrines involve extra components such as cut glass, lighting, drivers and locks, and they need more careful packing. Each of these items can add time, especially if the glass is tempered or the lock system is customised.

Can I speed up a made to order furniture timeline?

Yes. Send complete drawings, approve finishes and samples promptly, choose standard materials where possible and settle shipping terms early. Most delays come from late changes and slow approvals, so organised feedback saves more time than anything else.

Is a sample necessary before a bulk order?

It is strongly recommended. A sample adds some time at the start, but it lets you check size, colour, hardware and glass before mass production. Correcting problems after production has started usually takes much longer than approving a sample first.

Does shipping time count in the production time?

No. Production time ends when the goods are packed and ready for dispatch. Shipping depends on the destination, transport mode and Incoterm, so ask for production and delivery estimates separately to plan your schedule properly.

Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.

Related products

All Console Table Models

Get a quote for Console Table Models

Share dimensions and quantities; we will prepare a quote for your project.