Door Model Drawings to Request Before Approval: Elevations, Sections and Hardware Positions
Door shop drawings turn a catalogue picture into a buildable, checkable product. This guide lists the exact views you should ask for before you approve a door model for production.
Door shop drawings are the last safety net between a design intention and a pallet of finished leaves. Before you approve a door model for production, you should have a set of elevations, sections, hardware position details and a schedule reference that all agree with each other. This guide lists the views to request, what each one should show and how to review them quickly.
A render or a catalogue photo tells you what a door looks like. A drawing tells you what will actually be made, and that is the document your contractor, hardware supplier and installer will rely on later.
Why drawings matter more than photos
Photos hide the details that cause most disputes: the position of a lock, the depth of a groove, the thickness of an edge or the gap around the leaf. Two doors that look identical in a picture can be built very differently.
Approved drawings also create a clear reference point. If a delivered door differs from the signed drawing, the discussion is short. If there is no drawing, the discussion is long and rarely pleasant for either side.
For international projects the drawing is also the common language. Your team, the factory and the site installer may speak different languages, but a dimensioned drawing is understood by all of them.
The core set: what to request
Think of the drawing package as five layers. Each answers a different question, and none of them replaces the others.
- Door elevation for each model and size.
- Horizontal and vertical sections through the leaf and frame.
- Hardware position drawing with dimensions.
- Frame and wall interface detail.
- Door schedule cross-reference linking each drawing to door numbers.
1. Door elevation
The elevation is the front view of the door leaf, and ideally of the leaf in its frame. It should show overall leaf height and width, the layout of any grooves, panels, glazing or inlays, and the direction of the grain if veneer is used.
Check that the dimensions are given in a clear unit, such as millimetres, and that the leaf size is separated from the opening size and the frame size. Mixing these three is one of the most common sources of fitting errors.
Where the door is handed, the elevation should state which side is the hinge side and which side the door opens towards. Ask for both the hand and the swing to be marked, not left to interpretation.
2. Horizontal section
A horizontal section cuts through the door and frame at about lock height. It shows the leaf thickness, the core and skin build-up, the edge detail, the rebate in the frame, the stop and any seal grooves.
This is the view where you confirm that the leaf thickness matches your specification, for example 40 mm (1.6 in) or 45 mm (1.8 in), and that the gap between leaf and frame is shown. It is also where you can see whether the edge is square, bevelled or rounded.
3. Vertical section
The vertical section cuts through the head and the threshold area. It should show the head of the frame, the top of the leaf and the bottom of the leaf with the undercut or drop-seal recess if one is used.
Request this view whenever the floor finish is thick, such as carpet with underlay or stone, or when an acoustic or smoke seal is specified. The floor clearance needs to be visible and dimensioned, not assumed.
4. Hardware position drawing
This drawing places every hardware item on the leaf and frame with dimensions measured from a stated datum, usually the finished floor level or the bottom of the leaf. It should cover:
- Hinge positions, quantity and size, including the distance from the top and bottom of the leaf.
- Lock or latch centre height and backset.
- Handle or pull height and, for electronic locks, the routing and cable path.
- Door closer, stop or holder fixing positions.
- Peephole or viewer position if specified.
- Seal, drop-bottom or kick plate locations.
Hardware is where a good model can still go wrong. If the lock supplier's template differs from the factory's assumption by a few millimetres, every leaf in the order is affected. Sending the lock template to the factory and asking for it to be reflected on the drawing removes most of that risk.
5. Frame and wall interface detail
A door is only as good as the way it meets the wall. Ask for a detail showing the frame profile, the wall thickness it is designed for, the architrave or casing, and how the frame is fixed and sealed to the wall.
If you have more than one wall thickness in the project, each one needs its own frame section or a clear table of jamb widths. Do not accept a single generic detail for a mixed project.
Review table: what each drawing proves
| Drawing view | What it confirms | Typical error it catches |
|---|---|---|
| Elevation | Size, layout, handing, grain | Wrong hand, wrong groove spacing |
| Horizontal section | Thickness, core, edge, rebate | Leaf too thin or edge detail misread |
| Vertical section | Head, threshold, undercut | Floor clearance not allowed for |
| Hardware positions | Hinges, lock, handle, closer | Lock height or backset mismatch |
| Frame interface | Wall fit, fixing, architrave | Jamb not matching wall thickness |
| Schedule cross-reference | Quantities per door type | Door numbers linked to the wrong model |
Information every drawing sheet should carry
Beyond the views themselves, check the title block. A usable sheet should show the project name, the door model reference, the revision number and date, the scale and the units. It should also state the finish, the core type and the key material callouts.
Revision control matters. If you request a change and the factory updates the drawing, the new sheet should carry a new revision letter and, ideally, a short note describing what changed. Never approve a sheet without a revision marker.
How to run a quick drawing review
You do not need to be a joiner to review door drawings well. A simple routine catches most problems.
- Compare the drawing to your door schedule: door numbers, sizes, hand and quantities.
- Check leaf thickness, edge and finish against your written specification.
- Overlay the hardware drawing with the lock and hinge supplier templates.
- Confirm floor clearance against the finished floor build-up.
- Check that fire, acoustic or smoke requirements are reflected in seals and frame details.
- Ask the installer or contractor to review the frame interface before sign-off.
Involving the site team at this stage is worth the effort. Installers notice practical issues, such as access, fixing points and tolerances, that are easy to miss at a desk.
Approval, sign-off and what comes next
Door drawing approval should be a recorded decision, not an email saying that everything looks fine. Ideally the approval names the drawing numbers and revisions, lists any comments that must be incorporated and is signed or confirmed by the person with authority on your side.
For larger projects, link the drawing approval to a mock-up. The drawing shows the intent; a physical sample or mock-up door shows how the finish, weight and hardware feel in reality. Approving both together gives you a much stronger basis for mass production.
Also agree what happens after approval. Small clarifications are normal, but changes to size, core, finish or hardware positions after production has started can affect lead time and cost, and should go through a formal change request.
Common mistakes to avoid
- Approving only the elevation and skipping the sections.
- Leaving hardware positions to be decided on site.
- Not stating the door hand on the drawing.
- Using opening sizes and leaf sizes interchangeably.
- Accepting drawings without revision numbers.
- Approving drawings before the lock and closer suppliers have confirmed their templates.
What we provide at Palmiye
At Palmiye we prepare shop drawings from your project information and door schedule before production starts. Each package is built around the views described above, so your designer, contractor and hardware supplier can check the same set of sheets. The level of detail depends on the door type, the hardware and any fire or acoustic requirements in your destination country.
Next step
If you are planning a hotel door package, send us your door schedule, architectural drawings and hardware information. We will review them, prepare the drawing set for your approval and come back with questions or suggestions before anything goes into production.
Sıkça Sorulan Sorular
What are door shop drawings?
Door shop drawings are detailed, dimensioned drawings prepared by the manufacturer from your project information. They show the door elevation, sections, hardware positions and frame details exactly as the door will be made, so you can check and approve them before production begins.
Which drawing views should I request before approving a door model?
Request at least the elevation, horizontal and vertical sections, a hardware position drawing, a frame and wall interface detail and a cross-reference to your door schedule. Together they confirm size, build-up, hardware and fit.
Who should sign off door drawings on the buyer side?
Usually the designer or architect checks the look and details, the contractor checks the fit and site conditions and the owner or procurement manager gives the final approval. Confirm the approval in writing with drawing numbers and revisions.
Can I change a door after the drawings are approved?
Small clarifications are usually possible, but changes to size, core, finish or hardware positions can affect production and lead time. Once production starts, treat any change as a formal request that the factory must review.
Do I need a mock-up as well as drawings?
For larger or higher-category projects, yes. Drawings confirm dimensions and details, while a mock-up door shows the finish, weight and hardware in real conditions. Using both reduces the risk of surprises in mass production.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.