Bedroom and Wardrobe

Quotation Checklist for Hotel Bedroom Furniture: What to Send a Factory for an Accurate Price

A precise hotel furniture quotation request starts with the right information. This checklist covers the drawings, quantities, finishes and logistics details a factory needs to price guest room furniture accurately.

A well-prepared hotel furniture quotation request is the quickest route to a price you can actually rely on. The more precisely you describe the bedroom package, the less a factory has to assume, and assumptions are what cause quotes to differ by wide margins and change later. This checklist sets out what to send, in what order of importance, and why each item matters.

It is written for owners, procurement managers, designers and contractors who want to ask for prices anywhere in the world. Palmiye supplies hotel projects from Istanbul to many regions, so the list also covers destination details that affect the final number.

Why the quality of your enquiry decides the quality of the quote

A factory prices what it can see. If a request says only "100 rooms, bed, wardrobe, desk", the estimator has to guess board thickness, veneer or laminate, hardware level, packing method and delivery terms. Each guess is either padded for safety or left out and returned later as an extra.

A complete enquiry also makes comparison fairer. When several suppliers price the same documents, differences in the offers show real differences in approach rather than differences in understanding.

The core package: what to send first

If you can send only a few documents, send these. They allow a serious factory to prepare a firm budget quotation.

  • Room schedule: each room type, the number of rooms of that type and the furniture items in each.
  • Furniture bill of quantities (BOQ): a list of every item with a code, description, dimensions and total quantity.
  • Drawings: plans, elevations and, where available, joinery details in PDF or DWG.
  • Finish schedule: materials, colours and references for every visible surface.
  • Destination and timing: delivery country, port or site, preferred Incoterm and target dates.

Build a clear furniture BOQ for hotels

A furniture BOQ for hotels is the backbone of any bedroom furniture RFQ. It should list items by room type first, then give a project total, so the estimator can see both the repeatable units and the overall volume.

What each BOQ line should contain

  • A unique item code that matches the drawings, for example BD-01 for a bed base or WR-02 for a wardrobe.
  • A short description: headboard, bedside table, desk, luggage bench, wardrobe, minibar cabinet, wall panel.
  • Overall dimensions in millimetres (width, depth, height), with imperial in brackets if your team uses it.
  • Quantity per room and total quantity across the project.
  • Fixing type: freestanding, wall-hung, fixed joinery or bed-attached.

Separate loose furniture from fixed joinery

Loose furniture such as bedside tables, desks and benches is delivered and positioned. Fixed joinery such as built-in wardrobes and wall panels is cut to suit the room and installed. They have different drawing needs, tolerances and installation times, so list them in separate sections.

Mark what is not in scope

State clearly if mattresses, soft furnishings, mirrors, lamps, TV units or OS&E items are bought elsewhere. Unclear boundaries between packages are a common source of disputes later.

Drawings and design information

Drawings tell the factory how complex the work is. Send what you have, and say honestly what stage the design is at.

  • Floor plans of each typical room with furniture positions and ceiling heights.
  • Elevations of wardrobe walls, headboard walls and desk zones.
  • Joinery sections showing panel thicknesses, edge details and junctions with walls, floors and ceilings.
  • Electrical and lighting positions that interact with furniture: bedside sockets, USB points, reading lights, wardrobe LEDs.
  • Renders or mood images to explain intent where drawings are still concept level.

If you only have concept sketches, say so. A factory can usually give a budget range from concept material and then refine it once shop drawings are developed. Mention if you expect design support and shop drawings as part of the offer.

Finishes, materials and hardware

Finishes drive cost as much as dimensions do. A walnut veneer with a lacquered finish and a mid-grade laminate are very different items, even if they look similar in a render.

ItemWhat to specify
Carcass materialBoard type (MDF, plywood, particleboard), thickness, emission class if required
Visible surfacesVeneer species and cut, HPL or laminate reference, lacquer or oil, sheen level
EdgesEdge banding type and thickness, corner radius, solid wood or ABS
UpholsteryFabric or leather reference, flame-retardant requirement, foam density if set
HardwareHinge and runner type, soft-close or not, handles, locks, safe brackets
Metal and glassFinish of brass, steel or bronze parts; mirror and glass type

If you do not have final selections, name a quality level and a reference product or sample. Physical samples or clear photographs help far more than words such as "premium" or "durable".

Performance and compliance requirements

Some requirements change the materials or testing needed, so they belong in the first enquiry rather than a later revision.

  • Fire-retardant (FR) requirements for boards, foam or fabrics, and the standard or authority that applies in your country.
  • Low-emission or sustainability requirements, including any certification documents the project requires.
  • Brand standards, if the hotel operator has a design manual or approved finish library.
  • Accessibility clearances and heights for adapted rooms.
  • Special climate conditions such as high humidity, salt air or very dry heated interiors.

Do not assume these are understood. State them as written requirements, and attach the relevant section of the specification if you have one.

Quantities, room types and phasing

Give exact room counts per type, and flag if numbers may still change. Mention how many rooms are standard, accessible, connecting or suites, as they usually have different furniture.

If the hotel will open in phases or floor by floor, include the sequence and the approximate dates each block is ready. Batch deliveries affect production planning, packing and storage, and they can change how a factory structures its offer.

Also say whether you want spare stock, such as extra doors, drawer fronts or hardware, included as a separate line. It is easier to price spares at the outset than to reconstruct matching parts later.

Logistics, installation and commercial terms

Furniture price and delivered price are different things. To avoid confusion, tell the factory how far you want the supply to go.

  • Incoterm: EXW, FOB, CIF or DAP, or a request for options to compare.
  • Destination: country, port of entry, final site address and any known access limits such as lift size or staircase delivery.
  • Packing: sea-freight packing, room-by-room labelling and whether protective packing must be removed on site.
  • Installation: supply only, supervision, or full installation by factory teams.
  • Documents: certificates of origin, packing lists, invoices or other paperwork the destination customs office requires.
  • Payment preferences: currency, payment milestones and any bank or financing requirements.

Lead time depends on package size, materials, approvals and production load, so a reliable schedule is only possible once the scope is clear. Share your construction programme and the date furniture must be on site, and the factory can work backwards from there.

Common gaps that make quotes inaccurate

  • Quantities given as a rough total with no breakdown by room type.
  • Drawings that show furniture but no thicknesses, edges or fixing details.
  • Finishes described only by mood, not by reference or sample.
  • No mention of fire, emission or climate requirements.
  • Unclear scope for installation, packing and spare parts.
  • No target date, so lead time cannot be assessed.

A simple pre-send checklist

  1. Room schedule with counts per room type.
  2. Item-coded BOQ with dimensions and quantities.
  3. Plans, elevations and key joinery details in PDF or DWG.
  4. Finish and hardware schedule with samples or references.
  5. Compliance and climate requirements in writing.
  6. Delivery country, Incoterm, installation scope and timeline.
  7. Name of the contact who can answer technical questions quickly.

Next step

If you are preparing a hotel furniture quotation request, send us what you have, even if some items are still open. We will review the drawings and room schedule, list any missing information and come back with a clear quotation covering materials, packing and shipping options to your destination.

Sıkça Sorulan Sorular

What is the minimum I should send to get a hotel furniture quote?

At minimum, send a room schedule with quantities per room type, a list of furniture items with approximate dimensions, any available drawings, finish preferences and the delivery country. With these, a factory can usually prepare a budget quotation and tell you what extra information would make it firm.

Can I request a quote if my design is still at concept stage?

Yes. Share concept drawings, renders and a clear quality level, and say that design is still developing. A factory can give a budget range and refine it after shop drawings are prepared. Just note which items are likely to change so assumptions are visible.

Should I send drawings in DWG or PDF?

PDF is enough for most first quotations because it is quick to review. DWG is useful when dimensions need checking or shop drawings will be developed from your files. If possible, send both so the estimator can read the design and measure from it.

Why do hotel furniture quotes differ so much between suppliers?

Differences usually come from different assumptions: board thickness, finish quality, hardware, packing, installation scope or Incoterms. Giving every supplier the same BOQ, finish schedule and logistics terms makes offers comparable, so you can see what each price actually includes.

Do I need to decide the Incoterm before requesting a quotation?

Not necessarily. You can ask for prices under two options, for example FOB and DAP, to compare. It does help to name the destination country and port, plus any site access limits, so the factory can plan packing and advise on realistic shipping arrangements.

Can Palmiye quote for projects outside Turkey?

Yes. We supply hotel projects worldwide from our Istanbul factory. Send your drawings or room schedule together with the destination country and preferred delivery terms, and we will outline materials, packing, shipping options and an estimated lead time for your project.

Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.

Get a quote for Bedrooms and Walk-in Closets

Share dimensions and quantities; we will prepare a quote for your project.