Shutter Cabinet Inspection on Arrival: A Receiving Checklist for Hotel Site Teams
A practical routine for hotel site managers to unpack, check and record roller and louvred cabinet doors on delivery, so damage and shortages are caught while claims are still straightforward.
A solid shutter cabinet delivery inspection takes a trained site team a few minutes per unit and can save weeks of dispute later. Roller (tambour) and louvred doors have moving parts, fine slats and tracks that a flat panel does not, so they need a routine of their own. This guide gives you a step-by-step receiving checklist you can adapt for any hotel site, anywhere in the world.
Why slatted doors need their own receiving routine
A hinged door is either damaged or it is not. A roller shutter or louvred door can look perfect in its wrapping and still have a jammed track, a loose slat or a cord that was crushed in transit. These faults often appear only when the door is operated.
Receiving these units is therefore a combination of a visual check, a count against the packing list and a short functional test. Doing all three on the day of delivery protects your position with the carrier, the insurer and the factory.
Before the truck arrives
Preparation makes the inspection faster and more reliable. Agree these points with the site manager and the installer in advance:
- A named receiver who has the packing list, the approved drawings and the approved sample or mock-up room photos.
- A clean, dry, level area for unpacking, large enough to lay units flat or stand them upright without stacking.
- Equipment: camera or phone, tape measure, torch, marker pens, cutters that will not scratch finished surfaces, and soft blankets or boards to protect fronts.
- Access and handling: lift or trolley availability, door widths on the route, and enough people to carry tall units safely.
- Document templates: a receiving report form and a damage log, ready to be filled in.
Step 1: Check the delivery before unloading
Start at the vehicle or container, before anything is moved. Photograph the sealed doors, the seal number if one is used, and the general condition of the load.
- Compare the container or vehicle details and seal number with the shipping documents.
- Look for water marks, crushed corners, shifted loads or broken straps.
- Count the packages and compare the number with the delivery note.
- Write any visible problem on the carrier's delivery document before signing. A clean signature on a damaged load weakens a later claim.
Step 2: Inspect the outer packing
Check each crate, carton or wrapped unit before opening it. The outside often tells you what to expect inside.
- Look for punctures, crushed edges, wet cardboard and stains.
- Check that orientation labels, such as this way up, are consistent with how the package was carried.
- Confirm that labels show the room type, unit code and quantity so that units can be matched to the room schedule.
- Photograph any damaged packaging with the label visible in the frame.
If you spot heavy damage, stop and note it before opening further. Keep the packaging, because the carrier or insurer may want to see it.
Step 3: Unpack slatted doors carefully
Unpacking slatted doors is where most avoidable damage happens. Slat edges are thin and sharp-cornered finishes chip easily.
- Place the package on a protected surface in the orientation shown on the label.
- Cut tape and straps away from the surface, not across it. Use a blunt tool for film.
- Remove corner protectors and foam one at a time, keeping them for possible re-packing.
- Lift the unit by the carcass or frame, never by the slats, the handle rail or the roller housing.
- Leave any internal transit locks, cardboard inserts or tape holding the shutter in place until you are ready to test it. Note where they are.
Do not leave unpacked units leaning against walls at an angle. Long doors can bow if they are left unsupported for days.
Step 4: Visual check of the shutter surface
With good light, look along the slats from several angles. A torch held at a low angle shows scratches, dents and finish defects that overhead light hides.
- Finish: look for scratches, chips, bubbles, runs in lacquer or visible sanding marks.
- Colour and grain: compare with the approved sample and with neighbouring units that will sit side by side.
- Slats: check for cracks, loose slats, gaps that are uneven and warping along the length.
- Louvres: confirm angles and spacing are consistent, and that no blade is missing or detached.
- Edges: check the top and bottom rails and the handle for chips.
Natural timber varies in tone and grain, so judge against the approved sample rather than expecting identical slats. Flag anything that is outside what you approved.
Step 5: Check dimensions and components
Measure against the approved shop drawings. Record width, height, depth and the roller housing or track size, not just the overall carcass.
- Check tolerances agreed in the drawings or specification.
- Confirm handle type, finish and position.
- Check that tracks, guides, fixing brackets and any lock or damper are present.
- Look at the cord or tape, where used, for fraying, kinks or crushing.
- Verify that spare parts listed on the packing list, such as spare slats or cord kits, are in the shipment.
Step 6: Function test the door
This is the step that sets a shutter cabinet inspection apart from a normal furniture receiving check. Operate every door, ideally before the unit is fixed in position.
- Remove transit locks or ties, following the supplier's instructions.
- Open and close the door slowly through its full travel, three or four times.
- Watch for sticking, jumping, uneven movement or a door that leans to one side.
- Listen for scraping, rattling or clicking, which can point to a misaligned track or a loose slat.
- Check that the door stops cleanly at both ends and stays where it should.
- For louvred doors with adjustable blades, move the blades through their range and check that they hold position.
If a door does not run smoothly, note it. Do not force it, because forcing a jammed slat can turn a transport fault into permanent damage.
Step 7: Record findings and classify issues
Write down everything in a single receiving report, unit by unit. Use the unit code from the label so that the factory can identify the item quickly.
| Issue type | Examples | Typical action |
|---|---|---|
| Shortage | Missing unit, handle, bracket or spare kit | Note on delivery document and report to the supplier with the packing list |
| Transport damage | Crushed corner, broken slat, wet packing | Photograph, note on carrier document, notify carrier and insurer |
| Manufacturing fault | Finish defect, wrong size, track misaligned from the start | Report to the supplier with photos and measurements |
| Adjustment needed | Slight tension or alignment issue | Refer to the supplier's adjustment guide before installation |
Keep photos clear and well lit, with a tape measure or label in frame. Short videos of door operation are especially useful for faults that are hard to describe.
Step 8: Store units correctly until installation
Many units wait days or weeks before installation. Poor storage can undo a good delivery.
- Keep units indoors or under proper cover, away from rain, spray and standing water.
- Avoid areas with wet screed, fresh plaster or heavy construction dust.
- Store upright or flat as the supplier advises, and do not stack heavy items on top of slatted units.
- Leave protective film in place until installation, but remove any damp wrapping that traps moisture.
- Allow timber units to settle in the building's environment before fitting, particularly if the climate at the destination is very different from the factory's.
Who should sign and what to send back
The receiving report should be signed by the site receiver and, where possible, a second person such as the installer or project manager. Send the completed report, photos and videos to the supplier promptly, ideally on the same day.
Check your contract for the notice period for claims, and for the shipping term used, such as EXW, FOB, CIF or DAP, since the term affects who bears risk during transit and how a claim is handled. If you are unsure, ask your freight forwarder or insurer.
A quick one-page checklist
- Documents and seals match; carrier note marked for any damage.
- Package count agrees with the packing list.
- Outer packing photographed and damage recorded.
- Units unpacked on a protected surface and lifted by the frame.
- Slats, louvres, finish and colour checked against the approved sample.
- Dimensions and components checked against shop drawings.
- Each door operated through full travel and any faults logged.
- Spares counted and stored with the project records.
- Report signed and sent to the supplier with photos.
Next step
If you are planning a hotel project with slatted or roller cabinet doors, you can send us your drawings or room schedule. We will review them and come back with packing details, a receiving guide for your site team and a quotation for delivery to your country.
Sıkça Sorulan Sorular
How soon after delivery should shutter cabinets be inspected?
Inspect them on the day of delivery, starting with the outer packing before the carrier leaves. Check your contract and insurance terms for claim notice periods, because some are short. Complete the full unpacking and function test as soon as practical and send the report to the supplier promptly.
Should I open every crate or only a sample?
Check the outer packing of every package, but unpack and function-test as many units as you can. Hidden faults in moving doors are not visible from outside. If time is limited, agree a sampling plan with the supplier in advance, and open any package showing damage.
What are the most common faults on roller and louvred doors?
Typical issues include chipped finish, loose or cracked slats, crushed cords, misaligned tracks and doors that stick during travel. Many appear only when the door is operated, which is why a function test belongs in every receiving check, not just a visual look.
Can I force a sticking shutter door open to test it?
No. Forcing a jammed door can bend slats, damage guides or break a cord, which makes it harder to tell whether the fault came from transport or handling. Stop, photograph the problem, check for transit locks, and contact the supplier for guidance.
What should I do if units arrive damaged?
Note the damage on the carrier's delivery document before signing, photograph everything including labels and packaging, and keep the packaging. Then send the receiving report to the supplier and, where relevant, the carrier and insurer. Your shipping term affects who handles the claim.
Do I need spare slats and cord kits on site?
Spare parts are useful for small repairs after installation and during the opening period. Agree the quantities with the supplier when ordering, check them on arrival against the packing list, and store them with the project records for the maintenance team.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.