What Is Included in a Shutter Cabinet Export Quotation? A Line-by-Line Reading Guide
A shutter cabinet export quotation can look complete and still leave out packing, spares or installation. This guide walks through a sample quotation line by line so you can see what is covered and what is not.
A shutter cabinet export quotation should tell you exactly what you will receive, in what condition, under which shipping terms and at what point your responsibility begins. In practice, two offers for the same slatted unit can differ widely in scope, which is why a low total does not always mean a better deal. This guide reads a typical quotation from top to bottom, so you can see what each line covers and which questions to ask.
The sample structure below is illustrative. It is not a price list, and your own quotation will depend on drawings, materials, quantity and destination.
Why Line-by-Line Reading Matters
A quotation is the first draft of your contract scope. Anything that is not written in it is open to interpretation later, usually when the goods are already in production or on a ship. Reading it line by line lets you compare offers on equal terms, a point that matters for any hotel joinery offer sent from different countries.
Procurement teams often compare only the bottom line. A better approach is to build a simple comparison sheet with one row per scope item and mark each as included, excluded or unclear.
Section 1: Header and Project Information
The top of the document sets the frame for everything below. Check the following:
- Project name and room types: the quotation should refer to your drawings or schedule, with drawing numbers and revision dates.
- Quotation date and validity period: raw material and currency movements affect offers, so a validity date is normal.
- Currency: confirm which currency is used and whether it is fixed for the validity period.
- Quantities: the number of units per type, matched to your room schedule.
If the drawing revision on the quotation is older than yours, ask for a corrected version before going further.
Section 2: Product Line Items
This is the core of the document. Each cabinet type should have its own line, and each line should carry enough description to make it testable.
Unit description and dimensions
Look for width, height and depth in millimetres, with the door type stated clearly: louvred, tambour or roller shutter. A line that says only "shutter cabinet, wooden" is too vague to compare or to enforce.
Materials and finish
The line should name the carcass board, the slat material and the finish system. For example, it may state a veneered board carcass, solid timber slats and a water-based lacquer in a named colour or sample reference. If you have a RAL, NCS or approved sample reference, it should appear here.
Mechanism and hardware
For tambour or roller units, check whether the track, cord or guide system, handle and any damper or lock are included in the unit price. For louvred doors, check hinges and the adjusting rod if the slats move. If hardware brands are specified in your tender, confirm that the quotation names them or an agreed equivalent.
Interior fit-out
Shelves, hanging rails, drawers and interior lining are often priced separately or described briefly. Compare them against your drawings so that nothing is assumed.
Section 3: Items That Are Often Listed Separately
Some items are legitimate separate lines. Others are missing entirely, which is the real risk. Ask whether the following are included, priced as options or excluded:
- Shop drawings and design support
- A mock-up unit or sample set, and whether its cost is credited against the order
- Spare slats, cords, handles and fixing kits
- Fire-retardant boards or treatments, if your destination requires them
- Test reports or material documents you need for approval
- Fixing hardware for the wall, which depends on wall type
Section 4: Packing and Marking
Slatted doors are sensitive to impact and vibration, so packing is a scope item, not a detail. A clear quotation states the method: corner protectors, film wrapping, foam or cardboard layers, and export crates or pallets where needed.
Also check labelling. Marks by room type, floor or unit code make site receiving much faster and reduce mix-ups. If the packing line only says "standard export packing", ask for a description in writing.
Section 5: Shipping Terms and Logistics
The Incoterm defines where cost and risk transfer from the factory to you. The most common options for furniture projects are:
| Term | What the quotation usually covers | What you arrange |
|---|---|---|
| EXW | Goods ready at the factory | Loading, export clearance, freight, insurance, import clearance, delivery |
| FOB | Goods loaded on board at the named port, export cleared | Sea freight, insurance, import clearance, inland delivery |
| CIF | Freight and insurance to the destination port | Import clearance, unloading, inland delivery |
| DAP | Delivery to the named place, not unloaded | Import clearance, duties and taxes, unloading |
Whichever term appears, check that the named port or place is exact. Also look at whether container loading, port charges and any pallet or crate costs sit inside the price. If the order is small, ask whether the goods ship as a part load or in a full container, since this changes both cost and transit planning.
Section 6: Installation and Site Services
Many export quotations are supply-only. Installation, if offered, is normally a separate line that states the number of installers, the duration, and who provides accommodation, travel and site access. Do not assume it is included because the product description mentions "ready to install".
If you plan local installation, ask the factory for installation drawings and an adjustment guide for the mechanism, so your team can set tracks and slats correctly.
Section 7: Lead Time and Production Schedule
A reliable quotation links lead time to events rather than a vague number: drawing approval, sample approval, deposit receipt and material availability. The timing itself depends on quantity, finish and approval speed, so treat any figure as an estimate tied to the stated conditions.
Ask what happens if approvals are late, and whether production can be split into batches by floor or room type.
Section 8: Payment Terms, Warranty and Exclusions
Payment terms normally describe a deposit, a production milestone and a balance before or against shipping documents. Confirm the payment method and which documents are issued at each step.
Warranty wording deserves a careful read. Look for what is covered (materials, workmanship, mechanism), the period, the claim process and whether site damage or improper cleaning is excluded. Wording that is too general should be clarified in writing before you sign.
Finally, find the exclusions paragraph. Common entries include import duties, taxes, local permits, wall preparation, electrical connections and damage after delivery. Each one tells you a task you must budget for yourself.
Quick Checklist Before You Accept an Offer
- Do the drawing revision and quantities match your latest schedule?
- Are materials, finish reference and hardware named for each unit?
- Are spares, documents and test reports included or priced?
- Is the packing method described, and are units labelled by room?
- Is the Incoterm tied to a specific port or address?
- Is installation clearly included or excluded?
- Is lead time linked to approvals and payment milestones?
- Are warranty terms and exclusions written clearly?
Conclusion
A good shutter cabinet export quotation is specific about product, packing, shipping terms and exclusions, because those are the places where cost differences hide. Reading it line by line and comparing it with your drawings turns a price into a clear scope you can approve with confidence.
If you are preparing a project, send us your drawings or room schedule. We will review them and prepare a quotation that states scope, packing, shipping terms and exclusions line by line for your destination.
Sıkça Sorulan Sorular
What should a shutter cabinet export quotation include?
It should list each cabinet type with dimensions, materials, finish and mechanism, plus quantities, packing method, Incoterm with a named port or place, lead time conditions, payment terms, warranty and exclusions. It should also refer to your drawing numbers and revisions.
Is installation usually included in an export quotation?
Often not. Many export quotations are supply-only, and installation is a separate line with its own conditions for travel, accommodation and site access. Always ask for it to be stated as included or excluded so there is no misunderstanding later.
Which Incoterm is common for hotel cabinet orders?
FOB, CIF and DAP are all common, depending on how much of the logistics you want the factory to handle. EXW is also used by buyers with their own forwarders. The right choice depends on your experience with import clearance and your project programme.
Why do quotations for the same cabinet differ so much?
Differences usually come from scope rather than the product itself: board and slat quality, hardware brands, packing method, spares, documents, shipping terms and installation. Comparing offers line by line on a common sheet shows where the differences really are.
Are spare parts and samples part of the quotation?
Not always. Spare slats, cords and handles, and mock-up units or sample sets, are often listed separately or left out. Ask whether they are included, optional or credited against the order, and state the quantities you want in the request.
How long is a quotation valid?
The validity period is stated on the document and varies by supplier. Raw material and currency changes affect prices, so check the date, the currency and whether the offer can be extended if your approval process takes longer than expected.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.





