Vitrine and TV Unit Wholesale Terms: Payment Schedules, Deposits and Order Confirmation for First-Time Buyers
A step-by-step walk through the commercial paperwork of a bulk display and media furniture order, from proforma invoice to production release. Learn what to check at each stage before you pay a deposit.
If you are placing your first bulk order of glass display cabinets or media furniture, the commercial paperwork matters as much as the product. Clear wholesale vitrine order terms tell both sides what will be made, when payments fall due and what must be approved before the factory cuts a single board. This guide walks through the document sequence we see on most export orders, from the first proforma to production release.
The details below are general. Every project differs, so treat this as a framework to discuss with your supplier rather than a fixed rulebook.
The paperwork sequence at a glance
Most wholesale orders for vitrines and TV units follow a similar path. The names of the documents may vary, but the logic is the same.
- Enquiry with drawings, photos or a specification
- Quotation or offer
- Proforma invoice
- Order confirmation and technical sign-off
- Deposit payment
- Sample or finish approval (where required)
- Production release
- Balance payment and shipping documents
Note that the deposit and the technical sign-off are linked. A deposit paid before the drawings are approved often leads to disputes later, because nobody has agreed on exactly what the money covers.
Step 1: The enquiry and quotation
A quotation is only as accurate as the information behind it. For display and media furniture, send overall dimensions, glass type, shelf count, lighting, locks, finish and quantity per model. Photos of reference pieces help, but they do not replace a drawing.
Ask the supplier to list what the price includes. For example, are glass, LED drivers, hardware and export packing part of the unit price, or quoted separately? This is the first place where two offers can look similar and still differ in scope.
Step 2: The proforma invoice
A proforma invoice for furniture is the document that turns a quotation into a commercial commitment. It is not a tax invoice, but it is the basis for your bank transfer, your import licence in some countries and your customs planning.
Check that it contains the following:
- Full legal names and addresses of buyer and seller
- Item description by model code, with dimensions, materials and finish
- Quantity, unit price and total, with the currency stated
- Incoterm and named place (for example FOB Istanbul or DAP your warehouse)
- Payment terms and the supplier's bank details
- Estimated production time and what it depends on
- Validity period of the offer
If any line says only "TV unit, wood" or "glass cabinet", ask for more detail. Vague descriptions are the most common source of misunderstandings in bulk orders.
Step 3: Order confirmation and technical sign-off
An order confirmation for furniture export is where both parties agree in writing on the final scope. It usually refers to the proforma and attaches the approved shop drawings, finish samples or colour references and packing method.
For vitrines and TV units, we recommend confirming these points before the deposit is released:
- Exact dimensions and tolerances, including TV cut-outs and cable openings
- Glass type and thickness, and whether edges are polished
- Lighting details such as colour temperature and driver location
- Lock type and key arrangement
- Finish name, code or physical sample
- Packing method, including how glass is protected
- Labelling or carton marking requirements
Once both sides sign, changes should go through a written amendment. This protects you as much as the factory, because it creates a clear record of what was agreed.
Step 4: Understanding the deposit
A TV unit deposit payment reserves production capacity and allows the factory to purchase materials such as boards, veneer, glass and hardware. For custom-made pieces, materials cannot easily be resold, which is why deposits are standard practice in made-to-order furniture.
The size of the deposit and the way the balance is split are matters for negotiation. They depend on order value, whether the design is new or repeated, the materials and your history with the supplier. We do not quote a fixed percentage here because it varies from project to project.
Common payment structures
| Structure | How it works | Typical use |
|---|---|---|
| Deposit and balance before shipping | One payment to start, one before the goods leave the factory | Small and mid-size orders |
| Deposit, interim payment, balance | Additional payment at a production milestone | Larger or longer programmes |
| Deposit and balance against documents | Balance paid when shipping documents are presented | Established relationships or bank-supported terms |
Whichever model you choose, write it into the proforma and the order confirmation. A verbal agreement is difficult to rely on once the order is in progress.
Step 5: Sample and finish approval
For first-time buyers, a sample is often the safest way to check proportions, glass quality, lighting and colour. If you order a sample, agree in advance whether its cost is credited against the bulk order, and how long approval can take without affecting the production schedule.
If you do not need a physical sample, ask for detailed photos, a short video and a finish chip or reference code. Approve these in writing so the production team has a clear target.
Step 6: Production release
Production release is the moment the factory formally starts your order. It normally depends on three things being complete: signed drawings, an agreed finish and a received deposit. Some suppliers also need confirmation of packing details and delivery address.
Ask your supplier to state when the production clock starts. Does it begin on deposit receipt, on drawing approval or on sample approval? This single clarification prevents many disagreements about delivery dates.
Step 7: Balance payment and shipping documents
Before the balance falls due, you can usually expect photos or a video of the finished goods and packing. Review them against the confirmed specification. This is also the time to confirm the Incoterm, the forwarder, and the documents you need, such as the commercial invoice, packing list and certificate of origin.
Keep the document names and quantities consistent across all papers. Small mismatches between the invoice, the packing list and the cargo can slow down customs clearance.
Practical checklist for first-time buyers
- Never pay a deposit against a quotation alone; ask for a proforma invoice
- Make sure the proforma names the Incoterm and the currency
- Attach approved drawings to the order confirmation
- Agree on how changes are handled and priced
- Clarify when the production period starts
- Check the bank account name matches the seller's legal name
- Keep a written record of all approvals
Common mistakes to avoid
The most frequent problems are unclear descriptions, a deposit paid before sign-off and late changes after production has started. Another is comparing unit prices without comparing what is included. A lower price may simply exclude glass, lighting or export packing.
Also be careful with currency. If your quote is in one currency and your bank pays in another, agree who bears the exchange-rate difference and when the rate is fixed.
Planning custom and bulk orders worldwide
We produce custom display cabinets and media furniture in our Istanbul factory and supply buyers in many regions. Import rules, payment methods and documents differ by country, so it helps to tell us your destination early. We can then align the paperwork and the shipping terms with what your customs broker and bank will require.
Next step
If you are preparing your first wholesale order, send us your drawings, quantities and destination. We will prepare a proforma invoice with clear scope, payment terms and an order confirmation you can review with your team.
Sıkça Sorulan Sorular
What is a proforma invoice for furniture orders?
A proforma invoice is a preliminary document from the seller listing the items, quantities, prices, Incoterm and payment terms. It is not a tax invoice, but buyers use it to arrange bank transfers, import permits and customs planning. Once both parties accept it, it forms the base of the order confirmation.
How much deposit is usually required for a custom TV unit order?
There is no single figure. The deposit depends on order value, the materials, whether the design is new and the relationship between buyer and supplier. It is agreed individually and should be stated on the proforma invoice and the order confirmation before any payment is made.
When should I pay the deposit?
Pay after you have reviewed and accepted the proforma invoice and, ideally, once the drawings and specification are signed off. Paying before scope is agreed makes it harder to resolve disagreements about what the deposit covers.
What should an order confirmation include?
It should reference the proforma and attach approved drawings, finish references and packing details. It should also state quantities, Incoterm, payment schedule, estimated production time and how changes will be handled. Both parties should sign or confirm it in writing.
Can I change the order after production release?
Small changes may be possible if the affected parts have not yet been made, but they can alter price and delivery time. Any change should be put in a written amendment. Changes to size, glass or finish are easiest before production release.
Do I need a sample before a wholesale order?
It is not always required, but first-time buyers often benefit from one. A sample lets you check proportions, glass, lighting and finish. If a sample is not practical, detailed photos, a video and a finish reference can serve as an approved target.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.





