Console Table Price per Piece by Material Grade: A Sample Budget Table for 50 Units
A worked example of how a 50-unit console table order is budgeted, from material grade to crating and contingency. Use the structure to check and compare real quotations.
Most articles on pricing explain the factors behind a quote. This one does something different: it walks through a single, hypothetical order of 50 pieces so you can see how a console table budget per piece turns into a project total. The figures below are illustrative budget units, not a price list, and every real number depends on your drawings, timber, finish and destination.
The example brief
Imagine a 120-room hotel that needs 50 console tables for corridors, suites and the lobby. All pieces share one design: 120 cm (47 in) long, 35 cm (13.8 in) deep and 80 cm (31.5 in) high, with one shallow drawer. The hotel wants delivery to a single port and is comparing three material grades.
To keep the example neutral, we use budget units (BU) instead of currency. The Standard grade is set at 100 BU per piece, and the other grades are shown relative to it. Replace these with the figures from your own quotations.
Three material grades compared
The same design can be built at different grades. The assumptions below are for illustration only.
| Grade | Construction | Finish | Illustrative BU per piece |
|---|---|---|---|
| Essential | Beech or ash frame, veneered MDF or plywood top, ABS or solid edging | Water-based lacquer, standard colour | 82 |
| Standard | Solid oak or ash frame, oak veneer top with solid edge, soft-close drawer runner | Satin lacquer or hard-wax oil, colour matched to sample | 100 |
| Signature | Solid walnut or oak frame, book-matched veneer top, concealed joinery, metal detail | Multi-coat finish, custom stain | 135 |
The gaps between grades come mostly from timber choice, veneer selection and the number of finishing steps. They are not fixed percentages, so treat them as a way to frame the discussion with a supplier rather than as a benchmark.
Console table price breakdown per piece (Standard grade)
A useful console table price breakdown separates what is spent on materials from what is spent on labour and finishing. Here is how the 100 BU might be split in our example.
| Cost line | BU per piece | Notes |
|---|---|---|
| Timber and board materials | 32 | Solid parts, veneer, substrate, edging |
| Finishing materials and process | 18 | Sanding, stain, coats, curing, inspection |
| Hardware | 6 | Drawer runner, handle, levelling feet |
| Workshop labour | 34 | Machining, assembly, fitting, quality checks |
| Export packing | 10 | Corner protection, wrapping, cartons or crates |
| Total per piece | 100 | Ex-works product cost in this example |
Notice that labour and finishing together are larger than raw materials. This is typical for joinery-led furniture, and it is why a simple change in timber species rarely moves the price as much as buyers expect.
From unit cost to a 50-unit order total
Multiplying the unit figure by 50 is only the first step. A hotel console table cost estimate also needs the items that are spread across the whole order rather than attached to each piece.
| Budget line | Essential | Standard | Signature |
|---|---|---|---|
| Product cost (50 pieces) | 4,100 | 5,000 | 6,750 |
| Pre-production sample (assumed 1.5 pieces equivalent) | 123 | 150 | 203 |
| Planning allowance for changes (assumed 5% of product cost) | 205 | 250 | 338 |
| Subtotal before freight | 4,428 | 5,400 | 7,291 |
Sample cost, drawing work and any set-up for jigs may be shown as separate lines or absorbed into the unit price, depending on the supplier. Ask which approach is used so that you compare like with like. Freight, insurance, import duties and site installation are not included here because they vary with destination and shipping terms.
Adding freight and delivery terms
For worldwide orders, the quotation basis changes the total you see. An EXW or FOB price excludes sea freight, while CIF or DAP bring more of the transport into the supplier's scope. A 50-piece order is usually a partial container or a share of a mixed shipment, so the freight cost per piece depends on how the cartons or crates are packed and what else travels with them.
When you build your own spreadsheet, add these lines after the subtotal:
- Inland transport to the port of loading, if not included
- Sea, air or road freight to the destination
- Cargo insurance
- Import duty and local taxes, which your customs broker can confirm
- Unloading, storage and on-site installation
How to adjust a custom console table budget
If the first total is above your target, there are sensible places to adjust before reducing quality. A custom console table budget responds best to these changes:
- Simplify the finish. A satin lacquer in a standard colour usually needs fewer steps than a layered custom stain.
- Reduce hardware complexity. A standard soft-close runner is easier to source than a concealed or custom mechanism.
- Standardise sizes. One length across all 50 pieces keeps jigs and material cutting efficient.
- Choose the species deliberately. Ash or beech may meet your look at a different cost level than walnut, but the finish and veneer quality still matter.
- Keep the top simple. Square edges are generally quicker to produce than complex profiles.
Avoid cutting items that affect durability, such as edge protection, drawer runners or kiln-dried timber. Savings there tend to reappear as repair costs.
What to check in a supplier's quotation
Once you have a budget model, compare it with the quotation line by line. Confirm the following:
- The grade, species and finish match your specification and the approved sample.
- The price basis (EXW, FOB, CIF or DAP) is stated clearly.
- Packing method and quantity per carton or crate are defined.
- Quotation validity is stated, since timber and material costs can change.
- Sample, drawing and tooling charges are either listed or confirmed as included.
Using the template for your own project
Copy the structure of the tables above and replace the budget units with the numbers from your quotations. Run the same design through two or three grades so you can see where the difference sits: timber, veneer, finishing or hardware. That comparison gives you a stronger basis for deciding where a premium is worth paying.
Next step
If you are planning a hotel, restaurant or residential project, send us your drawings, a reference photo or a simple sketch with the quantity and destination. We manufacture to order in our Istanbul factory and ship worldwide, and we can prepare a grade-by-grade quotation so you can compare options before committing.
Sıkça Sorulan Sorular
How do I calculate a console table budget per piece for a 50-unit order?
Start with the unit price for your chosen grade, multiply by 50, then add sample costs, any set-up charges, a planning allowance for changes, and freight and installation. Request the quotation with each line shown separately so you can compare suppliers fairly.
Does a larger order always lower the price per piece?
Not automatically. Larger batches can spread set-up, programming and sample effort across more units, but the effect depends on the design, materials and production schedule. Ask the manufacturer to quote a few quantities so you can see how the unit cost actually changes.
Which parts of a console table cost the most?
In joinery-led pieces, workshop labour and finishing often add up to more than raw materials. Timber species, veneer selection, number of coats and hardware also matter. The exact split depends on your design, so a line-by-line quotation is the most reliable guide.
Are freight and installation included in the unit price?
Usually not, unless you request DAP or a similar delivered term. Ex-works and FOB prices exclude most transport costs. Always confirm the Incoterm, packing method and whether installation is offered, then add import duties and local taxes from your customs broker.
Can I get a quote from a photo or sketch?
Yes, a clear photo or sketch with approximate dimensions, quantity, preferred wood and finish and the destination country is usually enough for a first estimate. A final price needs confirmed drawings and an approved sample, because small details can change the cost.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.





